SAFETY CRITICAL CONTROL ROOMS

3CB have often supplied purpose built steel buildings to be used as Safety Critical Control Rooms. Below you will find a few examples of these types of Steel Buildings supplied and erected by 3CB ...

SMALLER FACILITY BUILDINGS

Here are some examples of smaller facility buildings that 3CB have supplied and installed over the years.

INDUSTRIAL STARTER UNITS

Over the years 3CB have supplied many steel buildings for Industrial purpose, these have included starter units for companies requiring smaller steel buildings and at a more affordable cost. Below you will see a few examples of our Industrial Starter Units that we have erected ...  

TWIN SPAN BUILDING FRAME

Fully dismantled twin span building frame (no purlins or sheeting rails). Sized at 280' Long (85m) x 150' Span (two spans totalling 46m = 23m/span) x 20' Eaves (6m)The building is fully dismantled in Scotland Please contact us for details quoting ref CAN18-43001​

Pitch SIDE CANOPIES & TRAINING ROOM UNITS

3CB have recently completed 4 pitch side canopy and training room units for a prestigious new sports facility under construction in the West of England. The design brief was originally for conventional steel buildings constructed on site. However we felt we could offer a lower cost and more attractive solution, both externally and internally, by designing and manufacturing pre-constructed and clad units which could be lifted onto site and subsequently timber clad in a fire resistant treated timber as specified by the architects. The project also incorporated a larger general storage building, again timber clad in a fire resistant tongue and groove board.​

11M HIGH BAY STORAGE WAREHOUSE

3CB were commissioned to obtain planning and undertake a total turnkey solution for this prestigious group. The group had to vacate its previous storage facility due to a housing project and establish a very large new store in a comparatively short period. The building itself at 27m x 47m x 11m was installed after demolition of an existing aged facility that was neither tall enough nor water tight. 3CB’s galvanised hot rolled steel solution was designed precisely to the clients specification to achieve a high level of racking density and thereby maximise use of the floor area. After completion 3CB installed a sophisticated automated lighting system and fire alarm. 3CB completed the project to the requested time frame and the client was delighted with our overall quality of performance and of the building also. Click the photos below to view the construction timeline ...​

WATER TREATMENT PUMPING

3CB recently undertook the design, supply and hazardous installation of a complex air entrainment building within a very large waste water treatment facility in the East Midlands. Time lines and working methodologies were tight. Working for a well-known and respected national main contractor on this project, and the successful completion of the work undertaken by 3CB, has led to further significant project work since - including new build and refurbishment work.​

COMPRESSOR HOUSE BUILDING

This compressor house, within a food manufacturing plant, naturally required a significant louvered area to allow incoming air for the compressors. The Client wished for a ‘built –up’ insulation system for the cladding. Comprising two separate sheets (inner white lining sheet and exterior light grey plasticol sheet in this instance) of materials with a spacing system between and the space filled with non-combustible Rockwool or similar. This is a less popular choice as the majority of your Clients call for a composite pre-manufactured insulated panel system. But 3CB can readily cater for either option. Unusually perhaps the Clients wished for the new oil free air compressor to be on display behind the aluminium glazed front to ensure such critical plant (vital in this prestigious high volume food manufacturing facility) weren’t hidden and forgotten and not maintained to the very highest of standards.​

ANIMAL NUTRITION SPECIALIST

3CB recently completed a full turnkey project for a prestigeous International animal nutrition specialist. With internal racking this fully insulated steel building was constructed on the foundations and yard designed and installed by 3CB.​

...
...
Steel Building Supplier 3CB

Steel Buildings Specialists offering a National & International service

01531 822 251

sales@3cb.co.uk

Watch Our Recent Videos

Get in touch with 3CB today for advice

& a no obligation quotation

01531 822 251

3CB for Steel Buildings UK

sales@3CB.co.uk

Contact 3CB for Steel Buildings